High-Bay Warehouse kept at full flow
In Aargau, Switzerland, the floor of a warehouse is being refurbished during ongoing operations with MC products like MC-DUR TopSpeed.
Refurbishment of Industrial floor with operations ongoing
Switzerland
Performing industrial floor repairs with operational activity continuing uninterrupted presents a special challenge to any applicator. And this was certainly the case when it came to refurbishing the floor in a high-bay warehouse located in the canton of Aargau in Switzerland. Here, not only was a high level of logistical competence required, but also a wide range of easy-to-apply and fast-curing industrial floor coating systems – all supplied by MC.
-
Name
Refurbishment of Industrial floor with operations ongoing
-
Country
Switzerland, 2023
-
Categories
-
Products
The highly stressed and heavily worn floor of a high-bay warehouse operated by an industrial manufacturing company was long due comprehensive repair. And the project entailed a good degree of cross-border European cooperation, with sales colleagues from MC-Germany and MC-Switzerland collaborating with chosen contractor Strabag AG, a leading European construction group that is also active in the “Alpine Republic”. MC's experts were involved in the solution-finding work from the very beginning of the planning phase. They were able to recommend the fast industrial flooring system MC-DUR TopSpeed for a large portion of the areas requiring a refurb, and the OS 8 coating system MC-DUR 1322 for a vehicle parking bay.
Implementation without operational disruption
The biggest challenge was that the floor area, which was divided into several zones and covered a total of around 7,500 m², had to be repaired with the storage and retrieval (S/R) operations ongoing. This demanded from all involved effective implementation concepts based around an ingenious logistical masterplan. The Strabag team also had to be trained by MC-Bauchemie in the use of the product systems in order to ensure that all work proceeded smoothly once it was set in train.

© MC-Bauchemie 2025
Top results with MC-DUR TopSpeed
The Strabag team first started with the main task: the repair and coating of the hard concrete over an area of 4,900 m² in the high-bay warehouse. This hard concrete exhibited extensive cracking, with voids apparent in a number of zones. And the fact that the work had to be carried out in numerous stages so as not to interfere with the ongoing operation of the high-bay warehouse added a further degree of difficulty.
Hence, all parties involved opted for an industrial floor structure based on the high-performance coating system MC-DUR TopSpeed. This allows industrial floors to be built up particularly quickly, with full service loading possible after just a few hours. In addition to accelerated curing, which occurs largely independently of weather and environmental conditions, MC-DUR TopSpeed is impressively easy to apply and scores high in terms of abrasion and scratch resistance. In addition to speed and reliability, the system offered a further plus in this project in that the required conductivity of the floor could be verifiably achieved by merely scattering a layer of conductive sand, thus eliminating the need for either a conductive primer or an antistatic top seal. Subsequently, MC-DUR TopSpeed was also applied to the lift forecourts and storage areas, covering a floor area of a further 1,200 m², and also in a loading bay over an area of 300 m².
Floor structure for a vehicle parking bay
Last on the agenda was coating work in a 1,000m² storage hall that was to be converted into a car parking bay for future use. Here, in accordance with the new usage profile, the fast-curing, high-strength industrial floor covering MC-Floor Screed 10 was first applied over the entire surface to be upgraded. This was followed by scratch and cavity filling with the highly fillable epoxy resin MC-DUR 1320 VK and quartz sand. The floor finish took the form of a top seal with MC-DUR 1322, a product that offers very good abrasion and chemical resistance.
The MC product systems not only ensured a visually and technically sophisticated outcome, but also contributed to the time and cost savings achieved by virtue of the fact that the warehouse remained fully operative throughout the refurb work.
RELATED CONTENT
-
News
Click here to go to our News section.
-
MC-Pedia
In our MC-Pedia you will find technical articles on various topics written exclusively by our specialists.
-
Magazine
Get our latest issues of our customer and employee magazine MC aktiv.
-
Downloads
Find all relevant datasheets of our products as well as brochures of our company, Fields of Expertise and product categories here.
-
References
Click here to get to our library with reference projects for all types of application.
-
Careers
Click here to go to MC Career.
-
Contact
Click here to go to our Contact section.